32 COMMISSIONING
ATTENTION! Risk of damage to the APU due to undetected errors during installation.
Carry out the check carefully in accordance with step
Now commission the SMA Inverter Manager
3
4
BATTERY
ON
OFF
TERM
ATTENTION! Risk of damage to the APU due to improper operation.
If you tap on the APU to activate it or confirm an action, be sure to comply with the following instructions to
avoid damaging the APU:
1 . Do not use objects to tap on the unit under any circumstances.
2 . Do not tap the marking on the casing to the right of the display too hard. Never tap on the display under
any circumstances.
NOTE The display will remain active for about two minutes before being deactivated. It can be reactivated by
tapping twice.
5
you can now commission all the slave storage systems. Proceed in reverse order according to their position in
the master/slave configuration. Start with the last slave of the master/slave configuration and switch the on-off
"SWITCH"
 17
6
7
Switch on the next slave storage system and proceed as described in step
already taken to commission the first slave.
When all slave storage systems have been commissioned, the master cabinet can be started up. To do this,
8
switch the on-off "SWITCH"
© SMA Solar Technology AG Subject to changes to the technical content! Version 1.1 Last updated 04/2021
Now you can determine the settings for the termination and addressing
of the STORAGE-67-TS-10 ("TERM"
dance with the section "Overview of all addressing options" on page
40 and the figures in "10.2 Capacity expansion using additional
CHARGER
STORAGE-67-TS-10 units" on page 36 et seq. For master/slave sys-
tems, set TERM
last storage system in the master/slave configuration. Set TERM
ADDRESS
ADRESS
"OFF" for the remaining slave APUs in the configuration.
on the SMA HV APU to on.
The number of recognized battery modules (14 or 16) will be displayed
on the screen of the slave storage system. Confirm the correct number
by tapping the marking
modules displayed differs from the actual number, take the
STORAGE-67-TS-10 out of operation and check the BAT COM cabling.
If the error persists, contact the service center.
After successful commissioning, the status will change to "CAN FLT."
of the SMA HV APU to on.
 17
2
, as deviations may damage the
.
12
to "ON" for the SMA HV APU of the master and the
 5
next to the display twice. If the number of
 16
APU.
and "ADDRESS"
) in accor-
 5
 10
and
, i.e. repeat the steps
4
5
to
 5