SMA STORAGE-67-TS-10 Nstallation And Operating Instructions page 26

Table of Contents

Advertisement

26 INSTALLATION
25
26
27
Only for master/slave systems: Run the CAN bus cabling between the "CAN OUT"
connections
specifications in section "5.5 Battery module wiring" on page 17 et seq. Use the patch cable(s)
scope of delivery of the slave storage system.
28
Finally, fill out the commissioning protocol. you will find a template for this on the TESVOLT USB drive
document the serial numbers of the battery inverter and the peripheral devices such as the
SMA Inverter Manager. Send the completed commissioning protocol to the SMA Service center.
© SMA Solar Technology AG Subject to changes to the technical content! Version 1.1 Last updated 04/2021
Use cable ties to fasten the cabinet connecting cables in the bottom
part of the cabinet to the cable clamp rails
Ensure that the cables are not crushed or damaged in the process.
Use patch cables
SMA HV APU to one of the two switches supplied
labeled "LAN." This switch is connected to the "LAN-2" jack of the
SMA Inverter Manager and will henceforth be referred to the "LAN-2
switch." The STPS 60-10 will also still be connected to it (see section "7
Connection to the Sunny Tripower Storage 60" on page 28 et seq.).
on the APUs of the storage systems in the master/slave configuration in accordance with the
6
1 .5
to connect the LAN connection point
7 .4
.
of the
 9
via the jack
8
and "CAN IN"
7
from the
7 .4
. Also
18

Advertisement

Table of Contents
loading

Table of Contents