Mounting

Mounting Checklist

Before mounting the source holder, perform the following steps:
1.
Conduct visual inspection of source holder.
2.
Ensure that the shutter is closed and locked.
3.
Make certain that external surfaces are not damaged.
4.
Check that the mounting position complies with the manufacturer's
engineering drawings and specifications. (See certified correct drawings or
contact VEGA.)
5.
Ensure adequate clearance to operate shutter or cable/rod mechanism.
6.
Consider in advance any high temperature or corrosive environmental
conditions. For example, you should consider the following items:
Adequate insulation to protect source holder from high temperature.
Special cooling system required to reduce source holder temperature.
Additional protection required to prevent corrosive material from settling
on source holders.
Excessive vibration.
7.
Have personnel and equipment, cranes, hoists, and supports available to
mount unit.
Be prepared to handle the weight of the unit. Remember, source holders are
very heavy.