Mounting; General; Unpack The Equipment - Vega SHLG Operating Instructions Manual

Source holder
Table of Contents

Advertisement

4

Mounting

4.1 General

Measurement accuracy is highly influenced by the proper installation of the
equipment. This section contains the guidelines for optimizing performance
through proper installation. You may also reference the application sizing sheet
and any installation drawings VEGA provided at the time of order.

4.2 Unpack the Equipment

Make sure you read and understand all the instructions and safety guidelines in
the Operating Instructions before you unpack, install, or operate the equipment.
The instructions in this manual are written for qualified and trained
personnel.Conduct visual inspection of source holder.
You must be familiar with radiation safety practices in accordance
with your U.S. Agreement State, U.S. Nuclear Regulatory
!
Commission, and other local and international nuclear regulatory
agencies before unpacking the source holder.
CAUTION
When you unpack your source holder, make sure you follow the steps below:
1.
Unpack the unit in a clean, dry area.
2.
Visually inspect the source holder for damage.
3.
File a claim against the carrier if there was damage to the unit during
shipment. Make certain you report the damage in detail. Any claims against
VEGA for shortages or errors in shipment, must occur within 30 days of
receipt of the shipment.
I
f you must return the source holder to VEGA, follow the instructions
!
in the Instrument Repair section of the Maintenance and
Diagnostics chapter.
NOTE
4.
Make sure the ON/OFF mechanism is closed and locked.
If you find the operating handle in the ON position, place the
handle in the OFF position immediately and contact your Radiation
!
Safety Officer or VEGA Nuclear Services.
CAUTION
39089-US-210509
Mounting
19

Advertisement

Table of Contents
loading

Table of Contents