Pre-Installation Settings
Wiring Considerations
The following information relates to wiring considerations for a AMX Lighting system.
Do not connect power to the device until the wiring is complete.
Preparing/connecting captive wires
1. Strip 0.25 inch of wire insulation off all wires.
2. Insert each wire into the appropriate opening on the connector according to the wiring
diagrams and connector types described in this section.
!
Axcess Control - PC to Axcess Controller
The following table lists the pinout information for the DB-9 connector.
DB-9 Connector Pinouts
Pin Signal
1
N/A
2
RXD
3
TXD
4
N/A
5
GND
FIG. 10 shows a DB9 pinout relation from the computer to the Axcess Central Controller.
Computer COM Port
DB9 (9-Pin Female)
FIG. 10 Computer to Axcess connection
Use cable FG #10-727 to connect computer the COM port to Axcess or AXCENT Program Port.
12
Do not tighten the screws excessively; doing so may strip the threads and damage the
connector.
Pin Signal
6
N/A
7
RTS
8
CTS
9
N/A
Connection view
2 (RXD)
3 (TXD)
5 (GND)
Pin 1
Pin 6
5 (GND)
3 (TXD)
2 (RXD)
3
AXCENT
Pro Program Port
DB-9 (9-Pin Female)
AMX Lighting PROlink/AXlink Programming
Pin 5
Pin 9