Touchscreen Calibration; Unpacking And Packing Instructions - ABB CP600-eCo Operating Instruction

Hide thumbs Also See for CP600-eCo:
Table of Contents

Advertisement

10

Touchscreen calibration

CP600-eCo control panels support calibration of the interface. To start calibration proceed as follow:
1)
Use the "tap-tap" procedure at boot (this procedure consists in tapping the surface of
the touchscreen during the device power-up phase. Tapping frequency must be high.
You have to start tapping the touchscreen as soon as power has been applied to the
device). When the sequence has been recognized, the system shows the message:
"TAP-TAP DETECTED".
2)
Release touch and wait few seconds until the message "ENTERING SYSTEM
SETTINGS" appears
3)
Press and hold touch for few seconds for selecting "TOUCHSCREEN CALIBRATION".
11

Unpacking and packing Instructions

CP604, CP607
CP610
to repack the unit, follow the instructions backwards.
Touchscreen calibration / Unpacking and packing instructions
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp604Cp604-bCp607Cp607-bCp610Cp610-b

Table of Contents