Cable Placement - Vermeiren Luna 2 Installation Manual

Hide thumbs Also See for Luna 2:
Table of Contents

Advertisement

3. Fasten the power cable by properly tightening the relief unit of the power cable (4).
4. Fasten the position of the relief unit by properly tightening the fixing screws (5).
3.4

Cable placement

3
1
11
6
2
1
4
9
4
4 3 2 1
8
10
Installation manual
1 = Power cable
2 = Power cable
3 = Holder
2
4 = Strain relief
5 = Screw joint
5
3
1.
Mattress slatted frame head end
2.
Mattress slatted frame feet end
3
3.
Sockets lifting pole
4.
Strain relief
5.
Power supply
6.
Control box
7.
Head end motor
5
8.
Knee-bend motor
9.
Head panel motor
7
10. Feet panel motor
11. Handset
All wires within the bed frame should
be placed in such a way that contact
with the floor, deformity and crushing
are avoided. Insert the power cables
for the motors in the opening on the
motor mounts.
11
Luna 2, Luna Basic 2, Luna UL 2
2021-03
Assembly
(power connection)
1 = Power cable
(Transformer
connection)
(power connection)
2 = Power cable
Strain relief
(transformer connection)
Power cables
3 = Holder Strain relief
4 = Strain relief Power
Strain relief
cables
5 = Screw joint Strain relief
EN
NL

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna basic 2Luna ul 2

Table of Contents