Heat Load Calculations - ACP Amana Xpress IQ AXP Series Quick Start & Reference Manual

Table of Contents

Advertisement

AXP/MXP Estimated Heat Load Calculations
AXP22TLT/MXP22TLT (single phase)
Parameters
Operating Time
Energy Costs
Idle Time
Cook Cycles/Daily
Typical Cook Time
Time
Data
(Minutes)
Warm Up
15
Cooking
100
Idle Time
605
HVAC Requirements per Operating Time (Estimated)
Average
Energy
Warm-Up
Cooking
Energy
and Idle
79,300 kJ
3,374 kJ
225 49
800-233-2366, 319-368-8120, Fax: 319-368-8198
12 Hours
$0.11 KWHr
2 Hours
100
60 Seconds
Power
(Watts)
3,475
0.87
5,318
8.86
1,431
14.43
TOTAL COST PER DAY $2.67
TOTAL COST PER MONTH $80.10
TOTAL COST PER YEAR $961.20
Total
Total
Average
Energy
Power
82,674 kJ
2,015 W
th
Ave. Dr. SW, Cedar Rapids, IA 52404
www.acpsolutions.com
kWh
Cost/Day
$0.10
$0.98
$1.59
Total
Environmental
Load
6.9 kBtu/hr
Page 13 of 26
Balance of
Time
(Hours)
11.75
10.08
0.00
Average
Cooling
Requirement
0.57 Tons of
AC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents