Marking The Site - C.P.A. White Pool 490 Assembly And Maintenance Manual

Table of Contents

Advertisement

WHITE POOL INSTRUCTION MANUAL
II.

Marking the site

1.
Mark the center of the site and drive a stake or screw driver into the soil (see diagram 2).
2.
Tie a piece of string onto the stick. At the other end of the string, tie a funnel. The distance between the stick and the
funnel should be 150 mm more than the radius of the pool (see diagram 3).
3.
Place flour or chalk dust into the funnel and draw a circle around the stake. If the smallest diameter is 3600 mm, then
the 2 circles should be 3900 mm in diameter (see diagram 4).
www.cpa-piscine.it
Diagram 2
Diagram 3
ground clearence 3900mm
pool 3600mm
Diagram 4
5200
pag. 9 / 29
Rev.00–16/10/20

Advertisement

Table of Contents
loading

Table of Contents