Assembly Of The Resin Vertical Supports - C.P.A. White Pool 490 Assembly And Maintenance Manual

Table of Contents

Advertisement

WHITE POOL INSTRUCTION MANUAL
XII.

Assembly of the resin vertical supports

Line up all the screw holes for the resin vertical supports. The first resin vertical support should be placed over the join in the pool
wall. Fix the resin vertical support onto the metal pieces. Line up the screw holes and check if the vertical sections are in line. Once
all resin vertical supports are in place and straight, fix the resin vertical supports with screws provided.
Attach the rest vertical supports (7) to the bottom metal pieces (14) where two bottom rails
are placed. Make sure each of the 3 tabs are inside the vertical supports (7). Drive the bolts
(19) into the sides and front of the vertical supports (7) so that it passed through with the
hole in the top/bottom metal piece (14) tabs. Repeat this process for the other two tabs in
the top/bottom metal piece (14) see diagram 33 and 34. Hook the rest top/bottom metal
pieces (14) on the top of the vertical supports (7), using the same procedure to fix
top/bottom metal pieces (14) to the top end of the Vertical supports (7), see diagram 35.
www.cpa-piscine.it
Place a top/bottom metal piece (14) on the top
end of the vertical support (7) so that each of
the 3 tabs are inside the vertical support (7)
and the top/bottom metal piece (14) sits flush
on the end of the vertical support (7). Drive the
bolts (19) into the sides and front of the vertical
support (7) so that it passed through with the
hole in the top/bottom metal piece (14) tabs.
Repeat this process for the other two tabs in
the top/bottom metal piece (14)
pag. 24 / 29
Diagram 33
.
Diagram 34
Diagram 35
Rev.00–16/10/20

Advertisement

Table of Contents
loading

Table of Contents