Phase 1 - Selecting A Suitable Site - C.P.A. White Pool 490 Assembly And Maintenance Manual

Table of Contents

Advertisement

WHITE POOL INSTRUCTION MANUAL
PHASE 1 – Selecting a suitable site
Carefully select the site for your new pool. This is the most important decision you will have to make to ensure the safety
and success of your pool construction. An incorrect site could cause problems in the future that may cause in jury, death or
financial loss.
Read carefully the check list set out below when selecting your site.
Phillips head screw driver
Small shifter
Clothes pegs
Sharp knife
Flat, level, firm and dry ground with easy access to all sides of the pool exposed to direct sunlight, preferably in the morn ing.
Safe access to electricity for running the filter pump and other pool accessories. Access to main water source.
Protection from wind.
sloping ground
concrete, asphalt, sandy gravel and swampy ground
close to wooden construction e.g. pergola's and
decking
next to deciduous or leafy trees
www.cpa-piscine.it
TOOLS REQUIRED
Spirit level
Site excavation tools
Protective gloves
Pre-cast cement block
ACCEPTABLE
NOT ACCEPTABLE
over-head wires and clothes line
drains, electric wires or gas pipelines underneath
the site
poor or little drainage or high flood risk locations
high wind conditions
pag. 7 / 29
Rev.00–16/10/20

Advertisement

Table of Contents
loading

Table of Contents