Levelling the area

Levelling is extremely important: take as much time as possible to work out a site that is completely firm and levelled. Use
a carpenter's level and straight edge to ensure that the site is completely level, flat and firm (see diagram 5). The pool
contains a huge amount of water and thousands of kilos of weight. Should the pool collapse due to unlevelled ground, it
could cause a lot of damage to property and even human injury or death!
Remove the higher ground rather than filling the low laying ground (see diagram 6).
Always remove grass and stones within the circle. Use ground sheet to ensure that the grass doesn't penetrate the pool liner
and cause damage.
Spread a light layer of fine brick layers sand over the foundation area. Level this layer evenly (see diagram 7) . Once the site
has been cleared and levelled, it is time to start assembling the frame assembly.
www.cpa-piscine.it
WARNING
Diagram 5
WARNING
remove high spots
Diagram 6
Diagram 7
do not fill low spots
pag. 10 / 29
Rev.00–16/10/20

Advertisement

Table of Contents
loading

Table of Contents