Page 1
DOE 2012 Hussmann refrigerated merchandisers configured for sale for use in the United States Energy Efficiency meet or surpass the requirements of the DOE 2012 energy efficiency standards. Compliant CR3-HV-SWD COMBINATION SERVICE AND SELF-SERVICE DELI/BAkERy CASE...
Shortages: Check your shipment for any possible shortages of material. If a shortage should exist and is found to be the responsibility of Hussmann Chino, notify Hussmann Chino. If such a shortage involves the carrier, notify the carrier immediately, and request an inspection. Hussmann Chino will acknowledge shortages within ten days from receipt of equipment.
INSTALLATION Leveling Receiving Case Upon receiving your new Hussmann Case all equipment should be thoroughly examined for shipping damage be- fore and during unloading. This equipment has been care- fully inspected at our factory. Any claim for loss or damage must be made to the carrier.
Page 6
INSTALLATION (Cont’d) 4. Apply masking tape 1/8” in from end of case on the inside LEGEND and outside rear mullion and to the side bulkheads on Grey Silicone Case Bolting both cases to be joined. The tape will minimize cleanup as needed from sealant overflow when the cases are drawn together.
Page 7
INSTALLATION (Cont’d) 9. Remove the masking tape from the bulkheads only 6. Slide the second case up to the first case snugly. Then and trial fit the stainless steel bulkhead caps. Once align the second case to the first case so that the proper fit is confirmed, apply a bead of silicone to glass, front bumper, bodywork, and top are flush.
INSTALLATION (Cont’d) Door Self Closing Adjustment: Setting Door Tension Using a 5/16” wrench turn and hold the top pin one full arc toward the handle of the door (Figure 1) While holding the 5/16” wrench and hinge pin in place, tighten the jam nut with a 11/16”...
INSTALLATION (Cont’d) Joint Trim LEGEND After cases have been levelled and joined, and refrigeration, Grey Silicone Case Bolting electrical, and waste piping work completed, install the splash as needed guards and joint trim where necessary. Fasten the splash Joint Trim guards along the top edge, or center, with 3/8”...
PLUMBING Waste Outlet and P-TRAP 3. Always provide as much down hill slope (“fall”) as The waste outlet is located off the center of the case on possible; 1/8” per foot is the preferred minimum. PVC one side allowing drip piping to be run lengthwise under the pipe, when used, must be supported to maintain the fixture.
REFRIGERATION Thermostatic Expansion Valve Location Piping This device is located on the same side as the refrigeration The refrigerant line outlets are located under the case. Locate stub. A balanced port expansion valve model is furnished first the electrical box, the outlets are then on the same side as standard equipment, unless otherwise specified by of the case but at the opposite end.
SPEC SHEET HIGH VOLUME DELI SERVICE - SELF SERVICE (PRELIMINARy) HUSSMANN - R3HV-SWD / CR3HV-SWD (CHINO) Note: Only (1) 10" shelf is available with flat front glass. REFRIGERATION DATA: END PANEL WIDTH kEy TEMPERATURE (ºF) VELOCITY TOTAL # OF *** CAPACITy...
ELECTRICAL Wiring Color Code BEFORE SERVICING ALWAYS DISCONNECT ELECTRICAL POWER AT THE MAIN DISCONNECT WHEN SERVICING OR REPLACING ANY ELECTRICAL COMPONENT. This includes (but not limited to) Fans, Heaters Thermostats, and Lights. Field Wiring and Serial Plate Amperage Field Wiring must be sized for component amperes printed on the serial plate.
The copper coils used in Hussmann merchandisers may to maximize life of the product. Hussmann cases were not be repaired in the field. Materials are available from local designed to “heat up” or “cool down” product - but rather to refrigeration wholesalers.
User Information (Cont’d) connection. 2. Check fixture loading. Overstocking case will affect its proper operation. 3. If frost is collecting on fixture and/or product, check that no outside doors or windows are open allowing moisture to enter store. These merchandisers were designed for use in stores were temperature &...
User Information (Cont’d) Front Deck Pan Placement 2. Clean With the Polish Lines ATTENTION! Some stainless steels come with visible polishing lines When reassembling the front self-service portion of or “grain”. When visible lines are present, you should the case, assure proper installation of bottom deck ALWAYS scrub in a motion that is parallel to them.
Need help?
Do you have a question about the CR3-HV-SWD and is the answer not in the manual?
Questions and answers