Transportation, Handling, And Installation; Packaging Of The Product, Transportation And Handling; Before Unpacking - Epson RC+ 7.0 Manual

Hide thumbs Also See for RC+ 7.0:
Table of Contents

Advertisement

3. Transportation, handling, and installation

3. Transportation, handling, and installation

3.1 Packaging of the product, transportation and handling

The transportation of the product must be made in accordance with the specific terms
indicated on the package (top, bottom, fragile, etc.). In addition, pay particular attention to
the following points:
WARNING
The IF-240 is shipped in a cardboard box with the following dimensions:
Dimensions
Gross weight
Table 3-1: gross weight and dimensions of the product when packaged

3.2 Before unpacking

Before unpacking, check the ShockWatch Label.
If the Shockwatch label is red, or if any evidence of damage during transit is detected, please
do the following:
(A) Request that the carrier's agent be present at the time of unpacking.
(B) Pay special attention to any damage on the exteriors of the product.
(C) If any damage has occurred, do not sign the delivery slip and contact the supplier of
(D) In every case, make a notation on the delivery packing slip.
22
- Be aware of the weight and take care when transporting the
system.
- Always hold the system firmly with two hands.
- The operator should not carry heavy shipping boxes by
himself.
- If the shipping box is to be left standing, it should be in a
horizontal position.
- Do not climb on the shipping box.
- Do not place heavy objects, on top of the shipping box.
550 × 400 × 300 mm
12 kg
your region immediately.
If the items received do not match your order, or are
NOTE
damaged, do not sign the receipt, and contact the supplier of
your region as soon as possible.
IF-240
Figure 3-1:ShockWatch
Part Feeding 7.0 IF-240 Rev.5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Part feeding 7.0If-240

Table of Contents