4 Installation

4.1 Shipping and Delivery

Every TruFit product is fully tested and has passed our thorough quality control inspection prior to delivery. Once
the product is tested and quality control inspected, the unit is then carefully packaged for delivery.
On delivery, inspect the system for any exterior damage that may have occurred during transit from the factory.
Any damage should be reported to the trucking company and marked on the bill of lading while the driver is still
on the premises. Also report any damages to ABB Field Service Support by calling 1-800-647-4782.
Inspect the PDU shipping container for any signs of damage or mishandling before removing any packing
material or attempting to unload the unit from the truck.
Ensure that the items on the bill of lading correspond to the material indicated in the delivery note.
Many units include kickplates that attach to the bottom of the unit. These are shipped separately and
require installation after the unit has been positioned into its destination. Store the kickplates in a secure
area until needed.
Inspect the outside of the packing material for obvious damage or rough handling.
DO NOT remove the packaging material until the PDU is ready for installation.
A thorough internal inspection should be conducted only after the enclosure has been positioned for
installation, and prior to making electrical connections.
Before moving the load (the unit and transport device, i.e. pallet jack or forklift), make sure that the
pathway is wide enough for the load and can support the load all the way to the installation site.
If damage is observed, file a damage claim with the shipper immediately and contact your ABB representative to
inform them of the equipment condition and claim.
If there is no visible sign of damage or indication of excessive shock, verify the equipment received to the
bill of lading. Report any missing or incorrect items to your ABB representative immediately.

4.2 Transport

The PDU is packaged on a pallet suitable for handling with a forklift or pallet jack.
The PDU must be moved in upright position.
Do not tilt cabinets more than +/- 10° during handling.
Move the PDU in its original packaging to the final destination.
Do not stack other packages on top: This could damage the PDU.
Figure 4.1.1 - Position of the forklift when moving the PDU
12/34 94-1100-00002873 A0 EN│TruFit
®
Power Distribution Unit
Forklift
Take note of the Center of Gravity marked on the
unit or outline drawing.
Check unit weight before handling the cabinet.