Installation; Busway Installation - ABB WavePro LT Installation And Maintenance Manual

Aluminium busway
Table of Contents

Advertisement

WavePro LT Aluminium Busway Installation and Maintenance Manual
8

Installation

Busway Installation

Pre-Installation Procedure
• When possible, deliver busway to its installation location before unpacking.
• Large labels on each hipping carton or crate designate the items contained.
• Additionally, each busway piece is identified with an item number label. Make sure to install all the
busways according the blueprint unless the engineer instructs locally.
• All the screw down moment should according to below form, excepting the bolt in the joint.
Screw Down Strength
Busway Installation
Horizontal Installation
• Horizontal through-the-wall installation
For dimensions of through-the –wall installation, please refer to the following figure.
Caution
Inspect each busway piece for possible damage or contamination. Contact surfaces must
be clean. However, do not attempt to polish tarnished contact surfaces. Check to ensure
that joint insulators are not damaged or cracked and are firmly in place.
Note
Make insulation resistance test for each piece before installation.
M10
M12
17.7~22.6
31.4~39.2
W+100
500
≥400
M14
51.0~60.8
Floor
W+100
500
Fig. 2.1
M16
M20
78.5~98.1
156.9 ~196.2
Wall

Advertisement

Table of Contents
loading

Table of Contents