Linkam Scientific Instruments THMS600 User Manual page 24

Temperature controlled stage
Hide thumbs Also See for THMS600:
Table of Contents

Advertisement

FTIR600 Vertical Stage Setup
Gas Purge Valve with
Tubing Connection
The Stage is sent out with Gas Purge Valve with
Tubing (1) disconnected.
1
To connect the Gas Purge Valve with Tubing, use
one hand to hold the black and blue colour gas
valve (2), then firmly and push the tubing into the
hole as far it can go.
Push
2
Note: to remove the Gas Purge Valve with Tub-
Pull
ing, pull back and hold the blue O-ring (3) and at
the same time pull on the Gas Purge Valve with
Tubing.
1
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents