RadonAway AIRaider 433-S50 Instruction & Installation Manual page 18

All residential & small system models
Table of Contents

Advertisement

1
2
3
4
3. Retesting
After the AIRaider
installation, the installer should perform another water analysis to ensure
TM
proper system performance. This sample should be performed one week after the date of installation.
Sampling Procedure:
1. Remove aerator from faucet or spigot, if applicable.
2. Run water so that the AIRaider
3. Turn off water for 5 minutes.
4. Turn water on and proceed with sampling as per the laboratory instructions.
4. Maintenance
Proper maintenance of the AIRaider
trouble-free service.
4.1. Six Month Service (recommended)
The following procedures should be followed to maintain the AIRaider
• Check and/or clean the blower air intake filter.
• Check and/or clean any filters or strainer installed on the inlet line to the AIRaider
installations with particularly high levels of sediment, cleaning of filters may be required
more frequently.
• Check and clean inlet screen on pump.
• Using a wet/dry vac, clean sediment from bottom of aeration tank if necessary.
• Clean (if necessary) tank and diffusers of all mineral buildup.
• Chlorinate tank and lines by pouring ¼ cup of chlorine into the first aeration chamber.
• Check all control panel connections and electrical components (blower, pump, timer, fuses, etc.) for
proper operation.
• Check float switches for proper operation.
• Inspect vent line for possible obstructions.
• Run system through two cycles to ensure good working order.
IN063 Rev.D 0120
RETESTING AND MAINTENANCE
operates for two cycles.
TM
can prevent possible system failure and provide years of
TM
3 Saber Way, Ward Hill, MA 01835 | radonaway.com
:
TM
. In
TM
Page 18 of 22

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for RadonAway AIRaider 433-S50

This manual is also suitable for:

Airaider 433Airaider 433-1Airaider 321

Table of Contents