Vent Line Installation - RadonAway AIRaider 433-S50 Instruction & Installation Manual

All residential & small system models
Table of Contents

Advertisement

1
2

2.5 Vent Line Installation

Use only 2", 3" or 4" Schedule 40 PVC or equivalent pipe for vent line.
Follow all applicable AARST, EPA, and/or State Standards for Radon
or VOC venting.
1. Place the lid of the AIRaider
using the Hex Head Screws and Washers provided.
2. Connect vent line toAIRaider
coupling (See Fig. 10).
3. The vent line must be routed in a manner that allows the system
to exhaust above the level of the roof (see Fig. 11).
Note: When "Freeze Up" is posssible a minimum pipe diameter of 3" is
recommended (See Fig. 12).
4. The vent line must be pitched back toward the system to prevent
condensation build up.
5. Cement all fittings in a manner that ensures no leakage will occur.
Be certain to use cement that is suitable for potable water applications.
6. Install weather cap on top of the vent line. This cap should not
restrict air flow and must prevent rain, snow and other contaminants
from entering the vent line.
* The Manufacturer has found that vent lines less than 250 equivalent
linear feet do not cause a decrease in contaminant removal percentages.
90° Bend = 15 Equiv. Linear Ft ; 45° Bend = 7 Equiv. Linear Ft.
IN063 Rev.D 0120
INSTALLATION INSTRUCTIONS
on to the tank and clamp into place
TM
lid using the enclosed rubber
TM
Failure to install a proper vent line
may cause contamination of the
water, outgassing of contaminants
into the building, and/or limit
system performance.
3 Saber Way, Ward Hill, MA 01835 | radonaway.com
Figure 8
Vent Line Installation (2 inch)
Vent Line Connection
Figure 9
0
Figure 12
n (3 inch)
Page 14 of 22

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airaider 433Airaider 433-1Airaider 321

Table of Contents