Preparing The Calibration Procedure, Calpend - ABB S4Cplus Instruction

Hide thumbs Also See for S4Cplus:
Table of Contents

Advertisement

 3UHSDULQJ WKH FDOLEUDWLRQ SURFHGXUH &DO3HQG
*HQHUDO
This section details all required preparations for performing Calibration Pendulum II
(CalPend).
3UHSDUDWLRQV IRU FDOLEUDWLRQ SURFHGXUH
127(
%HIRUH XVH RI WKH 3HQGXOXP &DOLEUDWLRQ DOO H[WHUQDO D[LV  ! PXVW EH GLVFRQQHFWHG
RQO\ UHTXLUHG IRU 5RERW:DUH  RU HDUOLHU 
3HAC 16578-1 Revision: E
$FWLRQ
1. Make sure the robot is prepared for calibration.
(i.e. all service or installation activities are
completed and the robot is ready to run.)
2. Check that all required hardware is available for
calibrating the robot.
3. Remove all peripheral equipment from the upper
arm of the robot (eg. tools and dresspack).
4. Remove all the covers for the surfaces where to
fit the calibration and reference sensors and
clean them with isopropanol.
1RWH The same calibration pendulum is used as
a calibration sensor and as a reference sensor
depending on its function at the time. In the
calibration procedure the pendulum will be called
calibration sensor or reference sensor
depending on its function at the time.
5. Clean the guide pin holes.
6. Connect the calibration equipment to the robot
controller and start up the Levelmeter 2000.
7. Calibrate the robot.
8. Verify that the calibration was successfully
carried out.

3.2.2. Preparing the calibration procedure, CalPend

1RWH
Detailed in the
each robot.
Specified in section
FDOLEUDWLRQ SHQGXOXP RQ SDJH
Mounting locations of reference and
calibration sensors are shown in
section
SRVLWLRQV &DO3HQG RQ SDJH
Use isopropanol.
Specified in section
/HYHOPHWHU  RQ SDJH
Detailed in section
D[HV &DO3HQG RQ SDJH
Detailed in
RQ SDJH
 &DOLEUDWLRQ
3URGXFW PDQXDO
for
(TXLSPHQW IRU
.
&DOLEUDWLRQ VHQVRU PRXQWLQJ
.
6WDUW XS RI
.
&DOLEUDWLRQ DOO
.
3RVW FDOLEUDWLRQ SURFHGXUH
.
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irc5

Table of Contents