6 Putting into service

Immediately check the supply power voltage, before switching on the device, according the proper network
voltage.
!
Do not supply the TS3 with 230V AC voltage if 115V AC is indicated in the front fuse-holder!

6.1 Procedure to Set the nominal power voltage

Extract the fuse-holder cover from the TS3 ( see chapter
Extract the fuse-holder from the cover, rotate it of 180° and re-insert it in the cover
Re-insert the fuse-holder cover into the TS3
Verify that the voltage value indicated is correct
The following screenshot will appear after the switching on the device.

6.2 Connections

For the connections under care of the user, it is advised to exclusively use test cable and power cable
provided by ABB SACE and carefully follow what mentioned in the present manual.
!
In this way, the TS3 test unit is able to comply with the international standards and guarantee a perfect
functionality even in heavy electromagnetic ambient environments.
888.902.6111
Figure 1
Figure 2
TS3
1SDH000670R0002
www.intellirentco.com
|
5.7
)
L3852
14/44

Advertisement

Table of Contents
loading

This manual is also suitable for:

L3852

Table of Contents