Motor lead pigtail splice fir 5/8 kv non-shielded and shielded cables ribbon or wire and unishield cables, cable size range, feeder 8 awg-500 kcmil, motor lead 10 awg-500 kcmil, copper conductors (12 pages)
™ The 3M Reenterable Gel Wrap PST Dome Closure is used for new and existing above-ground splices contained within a pedestal or below-ground splices within a hand-hole. 2.0 Kit Contents 4604GW and 4606GW Closures Closure Assembly (A) Dome Base O-ring...
4.0 Cable Preparation Preparation A Preparation B Remove sheath and scuff both cables as noted for the following closure sizes. 15" 23" Preparation A: 4604GW, 4606GW, 4608GW Remove Sheath Remove Sheath (381 mm) (584 mm) Preparation B: 4608XL-GW Scuff Both 6"...
5.0 Bonding and Grounding Install bonding connectors per system practice. Bonds should be placed so that the studs of the connectors are facing forward. Install external ground wires to bonding connector studs and run along the cables. Note: For external grounding of sealed copper plant, a solid copper wire bond must be used.
7.0 Sealing Collar Installation – 4604GW and 4606GW Cut and remove packaging from gel end seal core. Slit gel end seal ports along the length of plugs for desired number of cables to be installed and remove plugs. Use plugs 1 and 2 for main cables and plug 3 for branch or terminal cable.
Pull cables together with tape or cable ties to ensure proper fit to closure. 8.0 Gel Wrap Installation – 4604GW and 4606GW Starting at bonding connectors, begin wrapping elastic vinyl film. Continue wrapping the elastic vinyl film along the bundle until the bundle is fully covered.
9.0 Closure Installation – 4604GW and 4606GW Remove cardboard insert and pull core tail through the center of PST until core is even with PST edge. Slide PST over closure so that PST tail is pointed toward the top of the closure.
Page 10
Pull the core material from the PST until the PST is even with the bottom of the closure. Place assembly over splice and onto gel end seal. Insure the wireform latch and the 3M logo are facing forward. Continuously push PST downward while pulling the rest of the core material.
10.0 Sealing Collar Installation – 4608GW and 4608XL-GW 10.1 Cut and remove packaging from gel end seal core. 10.2 Slit gel end seal ports along the length of plugs for desired number of cables to be installed and remove plugs. Use plugs 1 and 2 for main cables and plugs 3 and 4 for branch or terminal cables.
10.6 Squeeze gel end seal to insure a seal between layers and cables. 10.7 Pull cables together with tape or cable ties to ensure proper fit to closure. 11.0 Gel Wrap Installation – 4608GW and 4608XL-GW 11.1 Starting at bonding connectors, begin wrapping elastic vinyl film. Continue wrapping the elastic vinyl film along the bundle until the bundle is fully covered.
COUNTERCLOCKWISE direction until approximately 2.0" (51 mm) of the PST is shrunk onto the closure. 12.4 Place assembly over splice and onto gel end seal. Insure the wireform latch and the 3M logo are facing forward. Mate the plate with the base.
12.5 Push PST towards bottom of closure. This will invert the PST. 12.6 Continuously push PST downward while pulling the rest of the core material. 12.7 When the PST is in place, remove the core wrap from around the cable. 12.8 For pedestal closure applications, secure the closure to pedestal, mount terminal block and connect ground wires according to system practice.
Note: Wipe O-Ring clean if dirty and relubricate. Cable grease is acceptable. 14.0 Retrofit on Gel Wrap PST Dome Closure 14.1 Existing 3M ™ Gel Wrap PST Closures can be converted to reenterable closures by using the following procedures. Cut PST from top to bottom and pull it away from the closure body and sealing collar.
Need help?
Do you have a question about the 4604GW and is the answer not in the manual?
Questions and answers