Commissioning - STIEBEL ELTRON DHE Connect 18/21/24 Operation And Installation

Hide thumbs Also See for DHE Connect 18/21/24:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION

Commissioning

10.2 Installing the mini wireless remote control
You can attach the mini wireless remote control to the wall using
the wall mounting bracket.
f Secure the wall mounting bracket to the wall using the adhe-
f
sive pad provided or a suitable countersunk screw (∅ 3 mm
or less).
11. Commissioning
11.1 Initial start-up
f Open and close all connected draw-off valves several times,
f
until all air has been purged from the pipework and the
appliance.
f Carry out a tightness check.
f
www.stiebel-eltron.com 
≥ 60 s
f Activate the safety switch by firmly pressing the reset button
f
(the appliance is delivered with the safety switch disabled).
In the DHE Connect 18/21/24 and DHE Touch 18/21/24 appliances,
the medium connected load (21 kW) is factory preset.
f Connect the programming unit connecting cable plug to the
f
PCB.