Installation Procedure - Atmor Enjoy Installation And Operation Manual

Electric tankless water heater full shower system 6kw/240v
Table of Contents

Advertisement

Available languages

Available languages

Assembly Instructions
01
Make sure power to the unit is shut
off by means of the dedicated circuit
breakers on the main electrical panel.
03
Insert the power cable into
the heater (Figure 3).
Do not connect to the
terminal block.
06
Connect the power cable to the terminal
block within the unit. (Figure 7)
Caution: The heater must be
grounded.
Make sure all wire connections are secure.
07
Secure the power cable
with the designated
clamp (Figure 7).
04
Make sure the unit is level.
Mount on the wall, and
secure using 1 inch
screws.
08
Replace the front
cover onto the unit and
reattach it with 2 screws
(Figure 2).
02
Remove the appliance
covers (Figure 2).
05
Connect the water hose
to the entry point of the
heater, and connect the
supplied accessories to
the water outlet.
Do not obstruct the
water outlet.
Use
only accessories
supplied with the heater
(Figure 6).
09
Restore power to the unit
by means of the dedicated
circuit breakers on the
main electrical panel.
7

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

At-ejsh-5

Table of Contents