Download Print this page

Assa Abloy Corbin Russwin IN220 PoE Installation Instructions Manual page 17

Cylindrical lockset
Hide thumbs Also See for Corbin Russwin IN220 PoE:

Advertisement

IN220 Cylindrical Lock
d. Next feed the cables/connectors through the inside mounting assembly (and gasket if required*).
e. Secure the mounting assembly while ensuring proper alignment of outside reader and tighten the
(2) through-bolts on the inside of the door to secure the reader (Fig. 9b).
f. Secure both ground lugs with #6-32 machine screw (Fig.9c).
*Gasket is required for outdoor installations. Do not use gasket for fire-rated openings.
If installing with gasket; separate gasket from mounting plate to feed cables/connectors
through holes as indicated (Fig. 9b).
Once cables/connectors are fed through, reattach gasket to mounting plate.
Copyright © 2016 Corbin Russwin, Inc., an ASSA ABLOY Group company.
All rights reserved. Reproduction in whole or in part without the
express written permission of Corbin Russwin, Inc. is prohibited.
5) Installation Instructions (Continued)
Inside of Door
Gasket*
Fig. 9b
17
NOTE: Cable lengths exaggerated for illustrative purposes.
Mounting
Plate
Through -
bolt
DPS
Reader Harness
Through -
bolt
Lock body
Harness
Cat5e cable
from hinge
Ground
Lugs
Fig. 9c

Advertisement

loading