Instructional Booklet
Effective: March 2021
Page 45
Operation and Maintenance Manual,
Automatic Transfer Switch Controller, ATC-900
Appendix C: Operational Flowcharts
• Open Delayed Transition (Contactor, MCCB, Power)
• Open In-Phase Transition (Contactor, Power)
• Closed Transition (Contactor, Power)
• The use of TDND, TDNR, TDED, and TDER timers.
Note: These flowcharts refer to "breaker" or "contactor."
IB140012EN
For more information visit: www.eaton.com