Initial Assembly Of The Vetter Smartfork; Installing The Vetter Smartfork® On The Fork Carriage - Vetter SmartFork Operating Instructions Manual

Hide thumbs Also See for SmartFork:
Table of Contents

Advertisement

Initial assembly of the VETTER SmartFork

Installing the VETTER SmartFork® on the fork carriage
4
Initial assembly of the VETTER SmartFork
4.1
Installing the VETTER SmartFork
Personnel:
Protective equipment:
Special tool:
Carry out installation of the VETTER SmartFork
order:
1.
2.
3.
Fig. 17: Opening the locking device
4.
32
NOTICE!
Initial assembly of the VETTER SmartFork
service specialist.
n
Service specialist
Industrial helmet
n
n
Protective work clothing
n
Protective gloves
n
Safety shoes
Lifting device
n
Prepare the lifting device for large loads, e.g. indoor crane and lifting straps. The
work is to be carried out by 2 people.
Move the fork carriage to the vertical position and move it to a height that allows for
safe and comfortable installation of the VETTER SmartFork
Remove the locking screw on the assembly side of the fork carriage.
Open the locking device of the VETTER SmartFork
®
SmartFork
- The intelligent SensorFork
®
®
on the fork carriage
®
may only be carried out by a
®
on the fork carriage in the following
®
by lifting the lever (fig. 18).
®
®
.
V1.08/2019

Advertisement

Table of Contents
loading

Table of Contents