Haivision MB6 Installation Manual page 20

Multichannel
Table of Contents

Advertisement

To power up the MB21 Chassis:
1.
Turn all two or four PSU Power On/Off switches to the ON (1) position.
2.
Connect the power cords to both power receptacles.
3.
Plug both cords into earthed AC power sources.
TIP
To ensure redundancy, each power input should be connected to a different 120/240V circuit and be
isolated.
The PSU Status LED will turn green indicating that the chassis is powered up (only if both or all four Power
On/Off switches are On).
In the front of the chassis, the Status LEDs will start blinking green, indicating that the encoders/decod-
ers/gateways are booting up.
4.
Wait until the Status LEDs stay solid green, indicating that the chassis is ready for operation.
CAUTION
The power supply cords are used as the main disconnect devices on the MB21 chassis. There-
fore, ensure that the socket-outlet is located/installed near the equipment and is easily accessible.
The MB21 chassis has more than one power supply cord. Be sure to disconnect both (2) power supply
cords before servicing to avoid electric shock.
To begin configuring the unit, open the Web interface and log in. Please refer to the product documentation for
details.
MB6 and MB21 Multichannel Chassis Installation Guide, v2.0, Issue 01
MB21 (21 Slot) Chassis
MB21 Installation
20

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mb21

Table of Contents