Greasing The Machine; Installing The Hitch Linkage - Toro Outcross 9060 Series Operator's Manual

Traction unit
Hide thumbs Also See for Outcross 9060 Series:
Table of Contents

Advertisement

3

Greasing the Machine

No Parts Required
Procedure
Grease the machine before use; refer to
Bearings and Bushings (page
Important:
Failure to properly grease the
machine will result in premature failure of critical
parts.
4

Installing the Hitch Linkage

Parts needed for this procedure:
1
Top link
2
Draft link
2
Lift link
2
Sway link
1
Drawbar
1
Hammer strap
2
Screw (M18)
2
Washer
7
Hairpin cotter
9
Clevis pin
2
Lower pin
8
Lynch pin
3
Lift-link pin
Installing the Sway, Draft, and Lift
Links
Note:
Figure 3
and
Figure 4
the left side of the machine. Repeat this procedure for
the right side of the machine.
Note:
Lift-link adjustment affects the parameter
settings for all attachments. Maintain a 1 cm (3/8 inch)
length of exposed thread.
1.
Use a lift-link pin and 2 lynch pins to secure the
lift link to the machine lift arms
Greasing the
58).
show link installation on
(Figure
3).
1. Lift link pin
2. Lynch pin
3. Clevis pin
4. Draft link
2.
Install the draft link to the machine as follows:
A.
Raise the pin plate
pin.
B.
Remove the lower pin
C.
Position the draft link as shown in
D.
Insert the lower pin through the frame and
draft-link joint
E.
Lower the pin plate so that it is positioned
over the pin.
3.
Use a clevis pin and a lynch pin to secure the lift
link to the draft link
4.
Use a clevis pin and a hairpin cotter to secure
the sway links to the machine frame
13
Figure 3
5. Lift link
6. Lower pin
7. Pin plate
(Figure
3), exposing the
(Figure
3).
Figure
(Figure
3).
(Figure
3).
(Figure
g263891
3.
4).

Advertisement

Table of Contents
loading

This manual is also suitable for:

07511aa07511ba07511ca07511da

Table of Contents