Commissioning Q1 X/X-X With Regxx - Unitek Classic Q1 Series Manual

4 quadrant circular current-free thyristor motor controller
Table of Contents

Advertisement

Settings
5.3

Commissioning Q1 x/x-x with REGxx

Check the connections prior to any commissioning.
Observe the type plate!
Basic power connections Q1
Mains connection
Mains connection
Mains connection
Motor connection
Field connection
Basic control connections REGxx
Enable
Command value
Actual value
Shields
Control electronics REGxx
Switch
Switch
Switch
Switch
Potentiometer
Potentiometer
Potentiometer
Potentiometer
Potentiometer
Potentiometer
Potentiometer
Classic Q1
Power
Auxiliary voltage
Field
A1/A2
F1/F2
PE
Contact between X1:3 and X1:4
Signal X1:6
Signal X1:9
X1:8
S4
P-ampl.
S5
I-comp.
S8
D-ampl.
S9
Actual value
I
Peak current
1
I
Peak current
2
ID
Continuous current
X
Amplification
P
INT
Integrator
n
Speed
max
Offset
Offset
Terminal
X10:15, X10:16
Terminal
X5:14, X5:17
Terminal
X5:18
Terminal
X10:10, X10:12
Terminal
X5:19, X5:20
Earth screws PE on the housing
GND X1:8a
GND X1:8b
Position 4
Position 4
Position 8
Position 8
10%
10%
100%
50%
Left full scale
Left full scale
50%
19