Hayward AquaRite + Owner's Manual page 5

Ph upgrade kit
Hide thumbs Also See for AquaRite +:
Table of Contents

Advertisement

Connecting the Water Supply Points For Measuring Chamber
Install the measuring chamber as close as possible to the pool pipes to avoid head losses. Install the Influent Tee to the Measuring
Chamber's inlet tube just before the Pump. Insert the reducer bushing into the faucet tee followed by the push fit fitting as illustrated below.
Ensure to use thread tape on the threads and screw in hand tight plus half a turn. If the threads leak water, remove and re-apply more
thread tape. over tightening can cause the the bush or the tee to split. Ensure the end of the black 3/8" tube is cut square and has no
burrs, then push it into the fitting until you feel it hit the base of the fitting. If it is not inserted correctly, has burrs or cut crooked, it will leak.
For the outlet tube, install Effluent Tee on the Filter return pipe and repeat the above instructions as for influent tee.
Push FIt Fitting
Reducer Bushing
Installing the pH Probe on the Measuring Chamber
The pH probe is "wet" packed and protected by a plastic cap. The probe tip must always remain wet. If the probe is allowed to dry, it will be
permanently unusable (not covered by the warranty).
Remove the pH probe from its plastic protective cap and set the cap aside for later use (winterising). To ensure that the probe remains
wet at all times, fill the measuring chamber with pool water before installing the probe. Apply a length of thread tape to the probe's threads.
Tighten the probe by hand only. Check that they are watertight at startup. If the probe leaks, do not tighten it further. Remove the probe
and reapply the thread tape, then reinsert the probe.
After installation, check that the probe is constantly in contact with the water in the chamber. The measuring chamber will hold sufficient
water to protect the probe when the pump is off during day to day filtration. If the pump will be off for extended periods of greater than one
week, it is recommended to remove the probe and fill the plastic cap that came with the probe full of water and screw it to the probe for
storage.
Installation on
AquaRite+
Installing the pH Probe to the AquaRite+
Once the pH probe is installed correctly in the measuring chamber, it can now be connected to the AquaRite+. The pH probe needs to be
physically connected to the AquaRite+ and activated by installing the pH chip set.
Installation should follow these steps:
» Insert the pH probe into the Measuring Chamber
» Remove the Dead Front Panel
» Connect the BNC connector on the pH probe to the pH BNC input on the AquaRite+ (Shown above)
» Fit the pH Chip Set in the terminal labelled pH on the AquaRite+ PCB
INSTALLATION
Tube
Threaded
Faucet Tee
Front View
pH Probe
Plugs
Valves
USE ONLY HAYWARD
Assembled
Side View
GENUINE REPLACEMENT PARTS
®
AquaRite+
pH BNC
Page 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents