Download Print this page

Braeburn Premier Series Installer Manual page 5

3-zone control panel, 1 heat/1 cool conventional systems
Hide thumbs Also See for Premier Series:

Advertisement

ZONE PANEL WIRING TERMINALS
Terminal
PANEL
24V
1
POWER
24C
DAMPERS
PO
2
COMM
PC
SUPPLY
SA1
3
AIR
SA2
EQUIPMENT
Rh
Rc
Y
4
G
G2
W
C
THERMOSTAT
R
Y
5
W
G
C
6
RESET BUTTON
7
Rc/Rh TERMINAL JUMPER (J1)
Note: Wire should be stripped to 3/8 inch minimum.
Qty.
Function
Description
1
INPUT
24 VAC Transformer Power 100 VA Maximum
1
INPUT
24 VAC Transformer Common
3
OUTPUT
24 VAC Power Open Zone Damper Terminal
3
OUTPUT
Zone Damper Common Terminal
3
OUTPUT
24 VAC Power Close Zone Damper Terminal
1
INPUT
Optional Plenum Supply Air Sensor Terminal 1 (No Polarity)
1
INPUT
Optional Plenum Supply Air Sensor Terminal 2 (No Polarity)
1
INPUT
24 VAC Equipment Transformer Power Connection
1
INPUT
24 VAC Cooling Equipment Transformer (Dual Transformer Systems Only)
1
OUTPUT
1st Stage Compressor
1
OUTPUT
1st Stage Fan Control
1
OUTPUT
2nd Stage Fan Control
1
OUTPUT
1st Stage Conventional Heat
1
INPUT
24 VAC Transformer Common
3
OUTPUT
24 VAC Thermostat Power
3
INPUT
1st Stage Compressor Call
3
INPUT
1st Stage Conventional Heat Call
3
INPUT
Fan Call
3
OUTPUT
24 VAC Transformer Common
Press once to restart panel
Hold for 5 seconds to reset panel and restore all factory defaults
Open jumper for dual transformer installations
5
Model 149156
Model 149156

Advertisement

loading

This manual is also suitable for:

140311