BayWa novotegra closed II Mounting Instructions page 17

Hide thumbs Also See for novotegra closed II:
Table of Contents

Advertisement

MV 11 – equipotential bonding and
lightning current carrying capacity
MV 11.1 – Attaching grounding connectors
MV 11.2 – Attaching contact latch module clamp
Subjects excepted. Illustrations are exemplary and may vary from the original.
V3.3 - April 2020/ASc,
Copyright BayWa r.e. Solar Energy Systems GmbH
Ground wire (∅ according to national
specifications):
Disassemble grounding connector, remove
clamping disk. Push component through
elongated hole in the base trough. Push ground
wire through the opening (suitable for ∅ 6-10 mm)
and attach the component with the self-locking
nut.
Ground wire tightening torque 20 Nm.
The applicable standards and guidelines, e.g.
lightning protection standard, must be observed.
Slide the contact latch on the sliding bracket over
the longitudinal bars of the middle clamp push it
up the screw. Tightening torque as described
above. The contact plate is used for equipotential
bonding and lightning current carrying capacity
of the system.
15

Advertisement

Table of Contents
loading

Related Products for BayWa novotegra closed II

This manual is also suitable for:

Novotegra east-west ii

Table of Contents