SUN2000-(55KTL, 60KTL) Series
User Manual
Figure 5-24 Connecting cables to a terminal base
(1) RS485A IN
(3) RS485B IN
Step 4 Install the terminal base on the terminal block, and connect the shield layer to the ground
point.
Figure 5-25 Connecting communications cables
Step 5 Bind communications cables after connecting them.
Issue 06 (2020-01-03)
When connecting the shielded cable, crimp the OT terminal if required.
Copyright © Huawei Technologies Co., Ltd.
5 Electrical Connections
(2) RS485A OUT
(4) RS485B OUT
52