Ensure that the jacket is in the maintenance compartment.
Figure 5-7 Three-core cable
(A) Core wire
Figure 5-8 Four-core cable
Step 2 Crimp the OT terminal.
Step 3 Route the cable through the waterproof connector.
Issue 06 (2020-01-03)
For ease of connecting the AC output power cable, you are advised to remove the nut assembly from the
AC terminal and save it for later use, and then route the cable through the waterproof connector.