Download Print this page

Kauber Frame Series Installation Manual page 3

Hide thumbs Also See for Frame Series:

Advertisement

The FRAME series includes projection screens with a perfectly tight projection surface, stretched
over a stylish aluminium structure. This series is dedicated to demanding users with a special
IMPORTANT!!! INSTALLATION AND OPERATION NOTES
1. The screen should be installed in a location away from moisture and strong sunlight.
2. Use a soft, moistened cloth for cleaning. Do not use active cleaners. After cleaning, the screen should be
carefully wiped to remove any residual moisture.
3. A properly mounted screen must be absolutely levelled.
4. DIMENSIONAL TOLERANCE: Projection surface: ± 0.5% of the nominal size; components ±5mm
Package contents:
Frame screen – frame elements
Mounting angle
M6x8 screw ("A" screw)
Washer 6.6
M6x12 set screw ("B" screw)
Magnet included with the screw
Surface fixing hooks
Wall mount bracket
Mounting pins for brackets (pin + screw)
Magnet holder
Holder mounting pins (pin + screw)
Projection surface
Mounting wire
Frame profiles 2.5 cm wide
LED tape
DreamScreen device
5V power supply
HDMI cable
purpose for home cinema.
w w w . k a u b e r . e u
-3-
Quantity
4 pcs
8 pcs
64 pcs
64 pcs
10 pcs
2 pcs
22 pcs
2 pcs
4 pcs
2 pcs
4 pcs
1 pc
4 pcs
4 pcs
2 pcs
1 pc
1 pc
1 pc

Advertisement

loading

This manual is also suitable for:

Frame led active