Chapter 4 - Installation Requirements; Vent/Combustion Air Transitions; 3" (80 Mm) To 2" (60 Mm) Transitions; Fig. 21 - 2" (60 Mm) Cpvc/Pvc Venting System Vertical - IDEAL Exalt Solo 110 Manual

Table of Contents

Advertisement

CHAPTER 4 - INSTALLATION REQUIREMENTS

4.1.

Vent/Combustion Air Transitions

NOTICE
LP Conversions of all Exalt models MUST be
installed using a 3" (80 mm) vent / combustion
air system.

4.1.1 3" (80 mm) to 2" (60 mm) Transitions

NOTICE
This chapter outlines the installation of 2" (60
mm) Venting and Combustion Air Piping for the
EXALT units when the vent system must transition
from the 3" (80 mm)outlet of the boiler to the 2"
(60 mm) vent system.
NOTICE
The EXALT boiler has a length of acoustic foam
already installed in the air inlet adaptor. DO NOT
remove this.
• For EXALT 110 & 155 Models only, propane
conversions require an additional acoustic foam
insert to be fitted within the combustion air
piping. Consult LP Conversion Instructions for
proper fitting.
1. The transition from 3" (80mm) vent system to 2" (60
mm) vent system must occur at the boiler vent outlet.
2. The transition from 3" (80 mm) vent to 2" (60 mm)
vent must occur in a vertical run only.
WARNING
Transition of 3" (80 mm) vent to 2" (60 mm) vent
in a horizontal run will result in pooling of the
condensate and potential vent blockage.
Failure to transition from 3" (80 mm) vent to
2" (60 mm) vent in a vertical run can result in
substantial property damage, serious injury, or
death.
3. Use
a
3" (80
mm)
reducer
to
make
2" (60 mm) CPVC/PVC vent, see Figs. 21 and 22.
4. Use a 3" (80 mm) appliance vent adapter and 3" (80 mm)
to 2" (60 mm) reducer to make the transition to 2" (60
mm) Polypropylene vent. See Table 3 on page 7.
5. The 2" (60 mm) vent must not transition back to 3" (80
mm) vent at any point in the vent system.
6. The PVC combustion air piping shall transition from 3"
(80 mm) to 2" (60 mm) using a 3" (80 mm) x 2" (60 mm)
bell reducer and shall transition in a similar manner as
the vent system.
x
2" (60
mm)
bell
the
transition
to

Fig. 21 - 2" (60 mm) CPVC/PVC Venting System Vertical

2 Inch Vent Pipe
PVC or CPVC
Material
2 Inch 90º
Long Sweep Elbow
CPVC Material
2 Inch Vent Pipe
CPVC Material
3 x 2 Bell Reducer
CPVC Material
3 Inch Stub Vent Pipe
CPVC Material

Fig. 22 - 2" (60 mm) CPVC/PVC Venting System Horizontal

2 Inch Vent Pipe
PVC or CPVC
Material
2 Inch Vent Pipe
Min. 7 Feet Length
CPVC Material
3 x 2 Bell Reducer
CPVC Material
3 Inch Stub Vent Pipe
CPVC Material
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents