Safety & Pressures; Wheel Nut Torque Specifications - K-Line TRASHCUTTER 2740T Operators Safety Manual

Table of Contents

Advertisement

A F T E R D E L I V E R Y C H E C K L I S T
1.
Check all pivot pins are fastened and anchor bolts are correctly
2.
tensioned. Follow tension specification.
3. Before mounting wheel to machine, check all hub and rim
contact surfaces are undamaged and free of paint, dirt and
grease.
Pg 17
4.
Lubricate wheel studs with standard viscosity oil.
5.
Tension wheel nuts for torque specifications.
6. Check tires are inflated.
7.
Ensure all appropriate safety decals are securely attached to
machine.
Pgs 12-15
8. Check hydraulic system is fully primed.
9. Check all safety mechanisms are in place and operating
correctly.
10. Lubricate heavy rear roller bearings. this page
11.
Instruction manual has been stored with machine.
TYRE SAFETY & PRESSURES
Always cage tyres before seating beads.
Never exceed a stated pressure when seating beads.
Do not attempt to mount a tyre unless you have the suitable
equipment & experienced personnel.
Inflating tyres can be dangerous. Always stand to the side when
inflating.
Load ratings of replacement tires should meet or exceed weight
requirements.
Correct tire pressure is 90PSI/ 620KPA
Before mounting wheel to machine, check all hub & rim contact
surfaces are undamaged & free of paint, dirt & grease.
Lubricate wheel stubs with standard viscosity oil.
Tension wheel nuts to 320ft Ilbs / 433nm.
For field operation: Re-tension afterst, 5th, then
every 50 hours of operation.
For road travel re-tension first 3miles (5kms), 10miles (15kms),
and thereafter at 25miles (40km) intervals
COULTER GANG ASSEMBLY
INSTRUCTIONS
Follow exploded view for assembly
NB when re-tensioning spindle nuts always loosen U-bolts
on one bearing arm to allow for side movement & re-tighten.
COULTER GANG SERVICE SCHEDULE
Torque Table
Spindle Nuts
1st Assembly
1100ft/Ibs
5hrs Operation
1100ft/Ibs
10hrs Operation
1100ft/Ibs
1100ft/Ibs
Every 50 hrs
Figure 36
WARNING
Wheel bearings:
Grease wheel bearings every 20 hours of operation.
Dimantle and repack with grease annually.
2740T TRASHCUTTER
new 2740 trashcutter op & safety manual.indd 29
new 2740 trashcutter op & safety manual.indd 29
pg 17
Pg 17
Pg 17
Pg 17
pg 19
.
Coulter Bolts
50ft/Ibs
50ft/Ibs
50ft/Ibs
50ft/Ibs
Figure 33
Figure 34
TYRE PRESSURE
Centre:
90PSI / 620KPA
Wing Wheels (both)
75PSI / 517KPA
Wheel Nut Tension:
320ft lbs / 433nm
Figure 35
Figure 37
Coulter bolt
Bearing Arm
OPERATOR & SAFETY MANUAL
Spindle nut
29
6/12/2019 7:07:06 PM
6/12/2019 7:07:06 PM

Advertisement

Table of Contents
loading

Table of Contents