Figure 72: Tk-78 Hardware Setup Menu - NEC 78K0/L 3 - See it! Series User Manual

Demonstration kit for the 78k0 l series
Table of Contents

Advertisement

78K0/Lx3 - See it!
Now after everything has been setup correctly it's time to compile and link the demonstration project. Close
the Options menu and select "Rebuild All" from the "Project" menu. If the project is compiled and linked
without errors it can now be downloaded to the 78K0/Lx3 - See it! board and debugged.
To start the IAR C-SPY debugger select the option "Debug" from the "Project" menu or press the (
)
"Debugger" button. In the next step the TK-78 Emulator has to be configured before downloading a new
application. Press the OK button to enter the hardware setup menu. Set the configuration as show in the
figure below and start the download by pressing the OK button.

Figure 72: TK-78 hardware setup menu

74
User's Manual U18759EE2V0UM00

Advertisement

Table of Contents
loading

Table of Contents