Advertisement

Quick Links

TLC4541/5EVM, TLC3541/5EVM,
TLC2551/2/5EVM AND
TLV2541/2/5EVM
User's Guide
Data Acquisition Products
March 2003
SLAU103

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TLC4541EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments TLC4541EVM

  • Page 1 TLC4541/5EVM, TLC3541/5EVM, TLC2551/2/5EVM AND TLV2541/2/5EVM User’s Guide Data Acquisition Products March 2003 SLAU103...
  • Page 2 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete.
  • Page 3 EVM IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation kit being sold by TI is intended for use for ENGINEERING DEVELOPMENT OR EVALUATION PURPOSES ONLY and is not considered by TI to be fit for commercial use. As such, the goods being provided may not be complete in terms of required design-, marketing-, and/or manufacturing-related protective considerations, including product safety measures typically found in the end product incorporating the goods.
  • Page 4 EVM schematic located in the EVM User’s Guide. When placing measurement probes near these devices during operation, please be aware that these devices may be very warm to the touch. Mailing Address: Texas Instruments Post Office Box 655303 Dallas, Texas 75265 Copyright  2003, Texas Instruments Incorporated...
  • Page 5 Related Documentation From Texas Instruments Preface Read This First About This Manual This user’s guide describes the EVM used to evaluate ten different serial analog-to-digital converters. These converters are the TLC4541/5, TLC3541/5, TLC2551/2/5, and TLV2541/2/5; 16-bit, 14-bit, 12-bit, and 12-bit devices respectfully.
  • Page 6 Contents FCC Warning This equipment is intended for use in a laboratory test environment only. It gen- erates, uses, and can radiate radio frequency energy and has not been tested for compliance with the limits of computing devices pursuant to subpart J of part 15 of FCC rules, which are designed to provide reasonable protection against radio frequency interference.
  • Page 7: Table Of Contents

    ............1 - 4 TLC4541EVM, TLC3541EVM, TLC2551EVM, and TLV2541EVM ....
  • Page 8 Contents...
  • Page 9: Evm Overview

    Chapter 1 EVM Overview This chapter provides an overview of the TLC4541/5EVM, TLC3541/5EVM, TLC2551/2/5EVM and TLV2541/2/5EVM. Topic Page Introduction ..........Features .
  • Page 10: Introduction

    Introduction 1.1 Introduction The series of TLC4541/5, TLC3541/5, TLC2551/2/5 and TLV2541/2/5 are high-performance low-power, miniature, CMOS, serial analog to digital converters (ADCs). The low power performance of these ADCs is further enhanced by an auto-power-down mode incorporated in each series. Three series of the devices run at a maximum sample rate of 200 Ksps and have their own internal conversion clock.
  • Page 11: Default Jumper Settings

    Default Jumper Settings 1.3 Default Jumper Settings Table 1 - 4. TLC4541EVM, TLC3541EVM, TLC2551EVM, and TLV2541EVM Designator 1 - 2 2 - 3 Enables reference offset for single-supply amplifier U1 Not installed Connects or bypasses buffer U1 to DUT Not installed...
  • Page 12: Analog Interface

    Analog Interface 1.4 Analog Interface The EVM board is designed for easy interfacing to analog sources such as signal generators and sensors. The buffer amplifier U1 is in a follower configuration, non-inverting gain of one. Output of this buffer drives the AIN(+) pin of the DUT through a 33-W resistor (R4).
  • Page 13: Power Supplies

    Power Supplies 1.6 Power Supplies The EVM requires three power supplies. 1) A dual-tracking ±12-V supply for the dual-supply op amps U1 and U3. The voltage reference (REF02) is supplied by the +12-V supply. Jumpers W6 and W7 are default settings for this voltage condition. 2) A single +5-V supply is used for the ADC (DUT) and the digital interface.
  • Page 15: Layout

    Chapter 2 Layout This chapter provides the board layouts. Figure 2 - 1. Top Assembly Layer Layout...
  • Page 16: Ground Plane Layer

    Figure 2 - 2. Ground Plane Layer Analog Ground Section Digital Ground Section Figure 2 - 3. Voltage Plane Layer Amplifier + Supply Amplifier - Supply...
  • Page 17: Bottom Assembly (Viewed From Top)

    Figure 2 - 4. Bottom Assembly (Viewed From Top) Layout...
  • Page 19: Evm Bill Of Materials And Evm Schematic

    Chapter 3 EVM Bill of Materials and EVM Schematic This chapter provides a bill of materials and schematic for the TLC4541/5EVM, TLC3541/5EVM, TLC2551/2/5EVM and TLV2541/2/5EVM. Topic Page EVM Bill of Materials ......... . EVM Schematic .
  • Page 20: 3.1 Evm Bill Of Materials

    Samtec TSM-110-01-T-DV-P Header 5 × 2 Samtec SSW-105-22-F-D-VS-K Socket 10 × 2 P1 P2 Samtec SSW-110-22-F-D-VS-K Gerbers Texas Instruments 6448430 R1 R3 R10 Panasonic or equivalent R2 R11 R12 Panasonic or equivalent ERJ-3GEY0R00V R4 R5 R6 Panasonic or equivalent ERJ-3GEYJ330V...
  • Page 21 EVM Schematic 3.2 EVM Schematic schematic diagram for the TLC4541/5EVM, TLC3541/5EVM, TLC2551/2/5EVM and TLV2541/2/5EVM is furnished as an attachement to this chapter. EVM Bill of Materials and EVM Schematic...

Table of Contents