Emerson Fisher Vee-Ball V200U Series Instruction Manual page 6

Rotary control valve
Table of Contents

Advertisement

V200U Valve
May 2020
If the valve has ENVIRO‐SEAL live‐loaded packing installed, this initial re‐adjustment will probably not be required. See
ENVIRO‐SEAL Packing System for Rotary Valves instruction manual (D101643X012) for packing instructions.
Figure 3. Fisher V200U Dimensions and Required Clearances for Installation
GG69033-A
Table 4. Fisher V200U Dimensions and Required Clearances for Installation
VALVE
VALVE
SIZE,
SIZE,
DN
NPS
80
3
100
4
150
6
200
8
250
10
80
3
100
4
150
6
200
8
250
10
1. Clearance necessary to remove the bolt.
2. Minimum internal diameter of the mating pipe or flange required for Vee-Ball clearance.
3. The NPS 10 CL300 construction requires 4 bolts per side (8 total) to be installed in blind, tapped holes on the valve body. The M value for these 1 – 8 UNC fasteners is 140 mm (5.5 inch).
6
B
M
A
A
B
100
59
116
68
160
89
200
124
240
147
3.94
2.34
4.58
2.67
6.30
3.52
7.87
4.89
9.45
5.78
P
GG69042
NOTE:
1
STUD QUANTITY AND PLACEMENT SHOWN FOR EXAMPLE DN200 PN40 FLANGE.
DIMENSION
(1)
M
PN 10/16
PN 25/40
CL150
mm
225
240
204
250
270
223
310
340
274
355
405
324
410
470
375
Inches
8.86
9.45
8.00
9.85
10.63
8.75
12.21
13.39
10.75
13.98
15.95
12.75
16.15
18.51
14.75
Instruction Manual
1
P
CL300
PN 10/16
PN 25/40
216
- - -
- - -
242
103
104
299
- - -
- - -
356
188
190
(3)
413
253
253
8.50
- - -
- - -
9.50
4.06
4.09
11.75
- - -
- - -
14.00
7.40
7.48
(3)
16.25
9.96
9.96
D104548X012
(2)
CL150
CL300
- - -
- - -
99
99
- - -
- - -
188
188
242
237
- - -
- - -
3.90
3.90
- - -
- - -
7.40
7.40
9.53
9.33

Advertisement

Table of Contents
loading