Chamber Replacement Interval - Bauer Compressors P0 Instruction Manual And Replacement Parts List

Breathing air purification systems and industrial air purification systems
Table of Contents

Advertisement

The used filter cartridge must be disposed of in accordance with local regulations.

3.2.1.2 Chamber Replacement Interval

The P0 Purification System is subject to dynamic loading. It is designed for a certain number of load
cycles. A load cycle equates to an abrupt pressure loss caused by draining the condensate.
The P0 Purification System must be replaced after reaching the maximum number of load cycles, other-
wise the housing may fail due to material fatigue.
The maximum number of load cycles for the P0 Purification Assembly is 45,000 if operated at 5,000 psi
(300 bar) or 63,000 if operated at 3,200 psi (225 bar).
If the number of load cycles of four per hour (i.e. the condensate is drained every fifteen minutes) is not
exceeded then the maximum number of operating hours before the P0 Purification System must be
replaced is 11,125 hours at 5,000 psi (300 bar). To avoid exceeding the maximum number of load cycles
the operating hours should always be recorded.
Page 13
NOTICE
^ WARNING
Purification Systems
3rd Edition, Rev 0 Chg 6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents