Tuthill nextec FILL-RITE NX25-120 Series Installation And Operation Manual

Tuthill nextec FILL-RITE NX25-120 Series Installation And Operation Manual

Ac fuel transfer pumps

Advertisement

Quick Links

NX25-120 & NX25-240 SERIES AC FUEL TRANSFER PUMPS
Installation and Operation Manual
MADE IN
USA

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the nextec FILL-RITE NX25-120 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Tuthill nextec FILL-RITE NX25-120 Series

  • Page 1 NX25-120 & NX25-240 SERIES AC FUEL TRANSFER PUMPS Installation and Operation Manual MADE IN...
  • Page 2: Table Of Contents

    Revision Date: August 1, 2014 Fill‑Rite and Sotera Products Tuthill Transfer Systems ("Manufacturer") warrants each consumer buyer of its products ("Buyer") from date of sale that goods of its manufacture ("Goods") shall be free from defects of materials and workmanship.
  • Page 3: Unique Nextec Features

    At Tuthill, your satisfaction with our products is paramount to us. If you have questions or need assistance with your product, please contact us at 1‑800‑634‑2695 (M‑F 8 AM–6 PM ET). Safety Information DANGER! Electrical wiring should be performed with extreme caution and in compliance with local, state, and national electrical code NEC/ANSI/NFPA 70, NFPA 30, and NFPA 30A, as appropriate for the intended use of the pump.
  • Page 4: Fueling Safety

    | NX25-120 & NX25-240 SERIES AC FUEL TRANSFER PUMPS CAUTION! This product is not suited for use with fluids intended for human consumption or fluids containing water. Materials of construction are not food grade. Water will cause rust and corrosion in the pump housing. If water enters the pump, flush immediately with a petroleum product (gasoline, diesel, kerosene, etc) to eradicate residual water.
  • Page 5: Anti-Siphon Device

    3" Min. IMPORTANT! Be certain the screen is properly seated in the indentation in the tank adapter before installing seal and tank adapter to the pump. Failure to properly seat the screen can result in fluid leakage. fillrite.com | tuthill.com...
  • Page 6: Ac Power Connection

    | NX25-120 & NX25-240 SERIES AC FUEL TRANSFER PUMPS Electrical Wiring WARNING! Electrical wiring should be performed ONLY by a licensed electrician in compliance with local, state, and national electrical code NEC/ANSI/NFPA 70, NFPA30, and NFPA 30A, as appropriate to the intended use of the pump. Threaded rigid conduit, sealed fittings, and conductor seal should be used. The pump must be properly grounded.
  • Page 7: Operating Instructions

    The locking link is located on the nozzle side of the pump, and can be pivoted into position to work with the nozzle listed on the barrel label of your NX25‑120 or NX25‑240 pump. Use the appropriate position and hole to lock your nozzle securely to your NX25‑120 or NX25‑240 series pump. fillrite.com | tuthill.com...
  • Page 8: Dimensional Information

    | NX25-120 & NX25-240 SERIES AC FUEL TRANSFER PUMPS NX25-120 & NX25-240 Dimensional Information Bung Mount Dimensional Information 228.20 8.984 227.58 8.960 153.62 6.048 91.51 3.603 117.48 4.625 312.23 21.73 R.856 12.293 262.56 10.337 218.54 8.604 250.90 9.878 76.37 3.007 111.99 193.12 269.29...
  • Page 9: Technical Information

    Compatible Fluids Diesel, Gasoline, Bio‑Diesel up to B20, E15, Kerosene, Mineral Spirits, Methanol (up to 15%) Strainer Mesh Size 20 x 20 Warranty 2 Years Minimum Rated Temperature ‑40° F / ‑40° C *Adding accessories will affect flow rate fillrite.com | tuthill.com...
  • Page 10: Servicing The Bypass Valve

    | NX25-120 & NX25-240 SERIES AC FUEL TRANSFER PUMPS Servicing the Bypass Valve (Dis-assembly) WARNING! Disconnect electrical power and relieve any pressure in the lines prior to servicing this pump! Failure to do so can result in damage to the equipment and personal injury or death! IMPORTANT! Removal of the bypass valve in the NX25‑120 or NX25‑240 series pump requires special attention;...
  • Page 11: Model Information

    1" X 18’ Static Wire Hose Hose 1" X 20’ Arctic Hose 900CD Digital Meter, 1“ NPT Meter 900CDP Digital Meter, 1" NPT TT10AB ‑ BSP Turbine Meter 1" Auto Diesel (Arctic) Nozzle 1" Ultra High Flow Nozzle, Red Cover fillrite.com | tuthill.com...
  • Page 12: Kits And Parts

    MATERIAL kit321sw NOTICE THIS DRAWING AND THE PRINCIPLES AND ELEMENTS OF DESIGN UNLESS OTHERWISE SPECIFIED EMBODIED THEREIN ARE THE EXCLUSIVE PROPERTY OF TUTHILL CORPORATION, TUTHILL TRANSFER SYSTEMS AND ARE NOT TO DIMENSIONS ARE IN INCHES 9/15/2017 THIRD ANGLE DATE BE COMMUNICATED, DISCLOSED, REPRODUCED OR USED EXCEPT AS PREVIOUSLY TWO PLACE DECIMAL 0.01in...
  • Page 13: Exploded View

    INSTALLATION AND OPERATION MANUAL NX25-120 & NX25-240 Exploded View KIT321JC Bung Mount Configuration KIT321NB KIT320SL KIT321RG KIT321SW KIT321BG Foot Mount Configuration KIT321JC KIT320SL KIT321SW KIT321RG fillrite.com | tuthill.com...
  • Page 14: Troubleshooting

    | NX25-120 & NX25-240 SERIES AC FUEL TRANSFER PUMPS Troubleshooting DANGER! Disconnect all power prior to performing any service or maintenance. Failure to disconnect the power may cause electrical shock, or unexpected starting of the motor, resulting in injury or death. WARNING! DO NOT open or attempt to repair the motor on your NX25‑120 or NX25‑240 series pump.
  • Page 15: Intelligent Tones

    P (800) 634‑2695 (+01) 260‑747‑7524 F (800) 866‑4681 Tuthill UK LTD. Birkdale Close Manners Industrial Estate Ilkeston, Derbyshire DE7 8YA UK P +44 0 115 932 5226 F +44 0 115 932 4816 tuthill.com | fillrite.com | sotera.com fillrite.com | tuthill.com...

This manual is also suitable for:

Nextec fill-rite nx25-240 series

Table of Contents