Advertisement

Quick Links

GV-AI System
Use
User's Manual
AI-UM-A

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GV-AI System and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GeoVision GV-AI System

  • Page 1 GV-AI System User’s Manual AI-UM-A...
  • Page 2 GeoVision. Every effort has been made to ensure that the information in this manual is accurate. GeoVision, Inc. makes no expressed or implied warranty of any kind and assumes no responsibility for errors or omissions. No liability is assumed for incidental or consequential damages arising from the use of the information or products contained herein.
  • Page 3 User’s Manual for GV-AI System Welcome to the GV-AI System User’s Manual. The Manual provides an overview of the GV-AI System and its accessories. It also includes the instructions to guide you through the installation and use of the GV-AI...
  • Page 4: Table Of Contents

    4  3.1 Basic Installation ..................4  3.2 Windows Setup Installation................5  3.3 System Restoration..................7  3.4 Updating GV-AI System ................8  3.5 Hard Drive Installation Guideline ..............9  3.5.1 Installation of 3.5-inch HDD ..............9   3.5.2 Installation of 2.5-inch HDD / SSD ............11  ...
  • Page 5: Safety Instructions

    Safety Instructions Observe these safety instructions to help ensure against injury to yourself and damage to the product. Read all safety and installation instructions before you operate the product.  Do not operate the product in high humidity areas or expose it to water or moisture. ...
  • Page 6: Chapter 1 Introduction

    Chapter 1 Introduction 1.1 Packing List The GV-AI System package includes the following items. If any of the items are missing or damaged, contact your dealer to arrange a replacement. Important: Please keep the original carton and all packing materials for future shipping need.
  • Page 7: Chapter 2 Overview

    Chapter 2 Overview 2.1 Front View Figure 2-1 No. Name Name Power Button HDD LED Reset Button USB 3.1 Gen 1 (Type-A) x 2 Power LED...
  • Page 8: Rear View

    Overview 2.2 Rear View Figure 2-2 No. Name Name Power Connector x 1 USB 3.1 Gen 1 (Type-A) x 3 PS/2 x 1 LAN x 1 Audio Jack x 6 USB 2.0/1.1 x 2 Center Speaker Out (Orange)  DVI-D x 1 ...
  • Page 9: Chapter 3 Getting Started

    Chapter 3 Getting Started 3.1 Basic Installation This section describes all the equipment required to program and operate the GV-AI System. Figure 3-1 1. Connect the mouse and keyboard to the USB or PS/2 port. 2. Using the supplied power cord, connect one end to the AC input and the other end to the power outlet.
  • Page 10: Windows Setup Installation

    Getting Started 3.2 Windows Setup Installation The Windows setup is preparing your computer for first use. 1. After the Windows starts, this setup screen appears. Select your language and click Next to continue. Figure 3-2 2. Select your regional settings and time zone and click Next to continue. Figure 3-3 3.
  • Page 11 4. Select between “Customize” and “Use Express settings” for your Windows 10 installation. 5. Type your account name. It is recommended that you create a password for your account and click Next. Figure 3-4 6. When the above setup process is complete, Windows will finalize your settings automatically in the background and restart.
  • Page 12: System Restoration

    To restore the operating system and all preinstalled software, follow the steps below. Note: The recovery will delete all files and restore the GV-AI System to factory default settings. 1. Remove or turn off the power of any connected USB devices.
  • Page 13: Updating Gv-Ai System

    7. Once the restoration is complete, click Finish to leave the recovery system and restart the Windows automatically. 3.4 Updating GV-AI System If you like to update your GV-AI System, contact your dealer for more information. Before contacting your dealer, you may check software update news at our website: http://www.geovision.com.tw...
  • Page 14: Hard Drive Installation Guideline

    Getting Started 3.5 Hard Drive Installation Guideline 3.5.1 Installation of 3.5-inch HDD 1. Unscrew the four screws on the top and two screws on each side of the system (a total of 8 screws). Pull out the motherboard tray.    ...
  • Page 15 4. Repeat step 3 to install another hard drive onto the hard drive bracket. 5. Push to lock the hard drive bracket back to its original position on the motherboard tray. Tighten the set screw to secure the hard drive bracket.  ...
  • Page 16: Installation Of 2.5-Inch Hdd / Ssd

    Getting Started 3.5.2 Installation of 2.5-inch HDD / SSD 1. Pull out the motherboard tray by following Step 1 in 3.5.1 Installation of 3.5-inch HDD. 2. Unscrew the two set screws on the hard drive bracket located in front of the fans. Figure 3-11 3.
  • Page 17: Chapter 4 Troubleshooting

    3. Push the Power button again to turn the GV-AI System back on. GV-AI System is unable to start. If your GV-AI System is unable to start after you push the Power button, try these steps: 1. Remove the power cord from the power connector.
  • Page 18 Troubleshooting GV-AI System suffers virus attack. GV-AI System is designed and optimized for Windows 10 platform. It may be vulnerable to newly created worms and exploits that attack any of the underlying operating system’s previously undocumented flaws. If your GV-AI System suffers virus attack, try rebuilding the operating system and the software.

Table of Contents