6.4. REQUIRED QUALIFICATIONS FOR INITIAL START UP AND CYLINDER
CHANGING
The test protocols from the piping according to tightness and if necessary moisture and particles are
available
Process gas tubes, vent piping and purge gas tubing, safety valve and check valve tubing if existent is
connected
In process gas tubing is only standard gas ( see 1.2)
The start-up is only realized by qualifi ed personal
Wear safety clothes according to regulations
Use spark-free tools and provide before installation
Before fi rst start-up check type label, if the manifold is suitable for the provided purpose (gas, pressure,
material, etc.)

6.5. INITIAL START UP

All requirements are fulfi lled as on point 6.4
Manifold is depressurized, handwheel turned completely to left side
All valves on manifold are closed
WARNING!
Make sure the manifold components are not exposed to pressure levels that exceed their respective
permissible nominal pressure.
Make sure that nobody could be hurt because of the initial start-up of manifolds.
6.5.1. PROCESS GAS PURGING MPLH0XSP AND MSLH0XSP,
MPLHEXSP AND MSLHEXSP
Manifolds with inert gas purging were used to get air from the atmosphere out of the components, before you
change cylinder or you want to depressurize coil or hose before cylinder change.
1. Purge valve is closed, red mark is visible
2. Pressure regulator is depressurized (closed)
3. Close inlet pressure valve, red mark visible.
4. Now the inlet pressure valve is just closed in direction pressure regulator. The way through purge valve
is open.
5. Slowly open cylinder valve
6. Process gas is streaming into coil/ hose
7. Close cylinder valve
8. Shortly open purge valve and let the gas from the coil/hose go
9. Immediately close purge valve after that
REPEAT STEPS 4. 9. FOR MINIMUM 10 TIMES

6.5.2. INERT GAS PURGING MSLH0XSE, MSLHEXSE

Manifolds of type MSLH0XSE, MSLHEXSE with external gas purging were used to purge toxic or corrosive
gas before cylinder change and to depressurize coil or hose. Make sure that relief valve tubing is connected.
1. Check if purge gas inlet, purge gas outlet, process gas inlet, relief valve and if existent safety valve are
connected properly
2. Close all valves, red marking is visible
3. Close pressure regulator by turning the handwheel anti clockwise
4. Open inlet purge valve
5. Close inlet purge valve. Gas has to stay for any seconds inside the component.
6. Open outlet purge valve for a very short time to release external purge gas through purge gas outlet
tubing
7. Close outlet purge valve
REPEAT STEPS 4. 7. FOR MINIMUM 10 TIMES