R410A50Hz Universal Outdoor Series Technical ManualController

6.Test Operation

(1) The test operation must be carried out after the entire installation has been completed.
(2) Please confirm the following points before the test operation.
 The indoor unit and outdoor unit are installed properly.
 Tubing and wiring are correctly completed.
 The refrigerant pipe system is leakage-checked.
 The drainage is unimpeded.
 The ground wiring is connected correctly.
 The length of the tubing and the added stow capacity of the refrigerant have been recorded.
 The power voltage fits the rated voltage of the air conditioner.
 There is no obstacle at the outlet and inlet of the outdoor and indoor units.
 The gas-side and liquid-side stop values are both opened.
 The air conditioner is pre-heated by turning on the power.
(3) According to the user's requirement, install the remote controller when the remote
controller's signal can reach the indoor unit smoothly.

(4) Test operation

Set the air conditioner under the mode of "COOLING" with the remote controller, and check the
following points.
Indoor unit
 Whether the switch on the remote controller works well.
 Whether the buttons on the remote controller works well.
 Whether the air flow louver moves normally.
 Whether the room temperature is adjusted well.
 Whether the indicator lights normally.
 Whether the temporary buttons works well.
 Whether the drainage is normal.
 Whether there is vibration or abnormal noise during operation.
Outdoor unit
 Whether there is vibration or abnormal noise during operation.
 Whether the generated wind, noise, or condensed of by the air conditioner have influenced
your neighborhood.
 Whether any of the refrigerant is leaked.