Section 4
Starting up
4.3

Checking the power supply

Check that the auxiliary supply voltage remains within the permissible input voltage range under
all operating conditions. Check that the polarity is correct before powering the IED.
Table 1:
Battery Supervision BATS
Station Battery
Active
Active
4.4

Energizing the IED

4.4.1

Checking the IED operation

Check all connections to external circuitry to ensure correct installation, before energizing the IED
and carrying out the commissioning procedures.
Energize the power supply of the IED to pickup. This could be done in a number of ways, from
energizing a whole cubicle to energizing a single IED. Set the IED time if no time synchronization
source is configured. Check the self-supervision function in Main menu/Diagnostics/Internal
events or Main menu/Diagnostics/IED status/General menu in local HMI to verify that the IED is
functioning properly.
4.4.2

IED start-up sequence

The following sequence is expected when the IED is energized.
The green Ready LED picks up flashing instantly and the ABB logo is shown on the LCD.
After approximately 30 seconds, "Starting" is shown on the LCD.
Within 90 seconds, the main menu is shown on the LCD and the green Ready LED shows a
steady light, which indicates a successful pick up.
If the green Ready LED continues to flash after pickup, the IED has detected an internal error.
Navigate via Main menu/Diagnostics/IED status/General to investigate the error description.
26
Insert only the corresponding male connector to the female connector. Inserting
anything else (such as a measurement probe) may violate the female connector
and prevent a proper electrical contact between the printed circuit board and the
external wiring connected to the screw terminal block.
Supervision Power Supply
Output Ready
Active
Active
The pickup time depends on the size of the application configuration. Application
configurations with less functionality have shorter pickup times.
© Copyright 2013 ABB. All rights reserved
Logic
Led Battery
1
On
0
Off
0
On
0
Off
1MRK 504 136-UUS B
VS+ (output voltage)
VS+ Supervision
VS+ Output
> 15.1 V
> 33.5 V
< 14.6 V
> 33.5 V
> 15.1 V
< 32.9 V
< 14.6 V
< 32.9 V
Transformer protection RET650
Commissioning manual
M11725-2 v4.1.1
M11726-2 v6
M11727-3 v9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ret650 a01a 2w/1cbRet650 a05a 3w/1cbRet650 a07a oltcRelion 650 seriesRelion ret650

Table of Contents