5.5 Electrical Mounting Of Model Gd-20-A; Requirements For Voltage Supply; Requirements For Electrical Connection; Pin Assignment (Model Gd-20-A) - WIKA GD-20 Series Operating Instructions Manual

Gas density sensor
Hide thumbs Also See for GD-20 Series:
Table of Contents

Advertisement

Available languages

Available languages

5. Commissioning, operation
Reset to factory settings
Writing 0x0001 in register 203 causes the transmitter to be reset to its factory settings
and a software reset to be carried out. After this process, all writable registers are reset
to the basic setting.
EN

5.5 Electrical mounting of model GD-20-A

5.5.1 Requirements for voltage supply

Supply voltage: DC 10 ... 30 V
The gas density sensor must be supplied with power by an energy-limited circuit in
accordance with IEC 61010-1.

5.5.2 Requirements for electrical connection

Cable diameter matches the cable bushing of the mating connector.
Cable gland and seals of the mating connector are correctly seated.
With cable outlets, no humidity can ingress at the cable end.

5.5.3 Pin assignment (model GD-20-A)

Circular connector M12 x 1 (5-pin)
1
2
3
4
5

5.5.4 Requirement for shielding and grounding

The gas density sensor must be shielded and grounded in accordance with the ground-
ing concept of the plant.

5.5.5 Connecting the instrument

1. Assemble the mating connector or cable outlet.
→ Pin assignments, see chapter 5.2.2 "Pin assignment (model GD-20-D)" and
chapter 5.5.3 "Pin assignment (model GD-20-A)".
2. Establish the plug connection.
Model GD-20-A, with field case
Terminal 5 is connected to the case, allowing a cable shield to be attached. No specific
ground connector is required.
24
U
Supply voltage
+
-
-
U
Mass
-
-
-
-
-
WIKA operating instructions gas density sensor, model GD-20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gd-20-aGd-20-d

Table of Contents