Monitoring Of Test Resources; Basic Safety Precautions; Pay Attention To The Instructions In The Operation Manual; Personnel Training - KERN PLJ-GM Series Operating Instruction

Precision balance
Table of Contents

Advertisement

Available languages

Available languages

3.4 Monitoring of Test Resources

In the framework of quality assurance the measuring-related properties of the
balance and, if applicable, the testing weight, must be checked regularly. The
responsible user must define a suitable interval as well as type and scope of this test.
Information is available on KERN's home page
the monitoring of balance test substances and the test weights required for this. In
KERN's accredited DKD calibration laboratory test weights and balances may be
calibrated (return to the national standard) fast and at moderate cost.

4 Basic Safety Precautions

4.1 Pay attention to the instructions in the Operation Manual

4.2 Personnel training

The appliance may only be operated and maintained by trained personnel.

5 Transport and storage

5.1 Testing upon acceptance

When receiving the appliance, please check packaging immediately, and the
appliance itself when unpacking for possible visible damage.
PLJ-GM-BA-e-1614
Carefully read this operation manual before setup and
commissioning, even if you are already familiar with KERN
balances.
Versions in other languages are non-binding translations.
The only binding version is the original document in German.
(www.kern-sohn.com
with regard to
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Plj 600-2gmPlj 6000-1gmPlj gm series

Table of Contents