FLARM Technology Ltd
Hinterbergstrasse 15
CH-6330 Cham
2.9
Annual Maintenance
Each FLARM system must be inspected and updated every 12 calendar months.
For installations in certified aircraft, the annual maintenance must be part of the
Aircraft Maintenance Program (AMP) or equivalent. For other installations, the
owner must set up an individual reminder 12 months after the previous
maintenance.
2.10
Installation Verification
After completing the installation, including configuration, verify that the device
starts up normally without any errors. See the User and Maintenance Manual for
details.
In addition, a range analysis should be conducted after a couple of flights to verify
acceptable range. This is formally not part of the installation/change to the type
certificate and the Certificate of Release to Service (CRS) may be issued before
the range analysis has been completed. See the User and Maintenance Manual for
details.
An Installation Verification Checklist is available in Appendix D and must be
completed as part of the installation verification.
The Installation Verification Checklist must also be completed after modifications
to the installation (e.g. change of display or antennas).
POWERFLARM FUSION
INSTALLATION MANUAL
Date: 2020-11-10
Version: 1.0
Page: 25 of 38
Document Number:
FTD-077
Need help?
Do you have a question about the POWERFLARM FUSION and is the answer not in the manual?